We have an existing installation of HPDM 4.6 SP4 consisting of a master server and two child servers.
Now, the office location that has the master server will be closed down and the server will be decommissioned.
One of the two existing child servers will become the new master. All 3 are currently functioning as
HPDM Gateways. The repositories are already sychronized.
What will I have to do to make this change in the server install?